Thursday, July 12, 2007
39th Floor
Today we visited a high-rise under construction and saw a most amazing way of finishing the floors. A crew of 4 was applying an engineered gypsum-based cap - from 1/16 to 2-1/2 inches in thickness - to concrete slabs that were poured as much as 8 months ago and left with just a darby finish. In-friggen-credible!
These are just a few of the 80 photos I took. Will post more sometime soon. Just remember the name Levelrock.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment